Back
Myrtle/Wyckoff Plaza

The future and capital build-out of the Myrtle/Wyckoff Plaza.

Implementation of the Myrtle/Wyckoff Plaza started on September 22nd, 2016.


(DOT workers hanging up the new signage at Gates Ave and Wyckoff Ave) 


(Signs and orange barrels inform the drivers on Gates and Wyckoff Aves that the small stretch of Wyckoff Ave is closed to motor vehicles)


(DOT Crews laying down epoxy gravel for the pedestrian plaza)


 

(The flowers and planters being shipped in to add to the newly constructed plaza)


The plaza was open to the public on September 29th, 2016.